In light of the recent unforeseen flooding of one of our school buildings due to continuous rain, a thorough monitoring session was conducted by Engr. Abraham Colocado and the Division DRRM Coordinator, Mr. Rommel Saquilayan. They were diligently assisted by our school principal, Dr. Naneth P. Salvador, along with the School DRRM Coordinator, Mr. Ryan Edel Abueg, and Assistant Coordinator, Mr. Emmanuel Abando.

This critical monitoring aimed to assess the extent of the damage and devise immediate and long-term solutions to ensure the safety and well-being of our students and staff. Engr. Colocado and Mr. Saquilayan provided expert insights and facilitated the necessary communication with the Schools Division Office (SDO) and the Local Government Unit (LGU) of General Trias City to address the issue promptly.

Through their swift action and collaboration, we are confident that the necessary measures will be taken to mitigate the impact of the flooding and prevent future occurrences. The school’s commitment to providing a safe learning environment remains steadfast, and we appreciate the support and cooperation of everyone involved.

Loading